Video captures one of our Kelvedon crew’s at work on this project where the client wanted to maximise the lifetime of their pavement within their planned road resurfacing works. This was key to maximise lifetime and minimise disruption to this site which includes a Tesco Distribution hub. A Tensar Glasstex asphalt interlayer was installed, to achieve all three functions of Reinforcement, Stress Absorption, and Moisture Barrier, which combine to give the greatest level of resilience.
Priory Park, Aylesford

